Setting Up the ECUTS
- Updated2023-02-14
- 1 minute(s) read
Setting Up the ECUTS
Refer to the topics in this section to set up the ECUTS-16000.
Installing the Monitor and Monitor Arm
The ECUTS-16000 includes a monitor as well as a monitor arm with a keyboard tray. Complete the following steps to install the monitor and monitor arm:
- Refer to the Ergomart TRS7000 Monitor Arm Installation Instructions to attach the monitor arm to the ECUTS-16000 mounting cylinder.
- Connect the computer monitor to the ECUTS-16000 DisplayPort, USB, and AC power cables located on top of the test rack.
- Connect a USB keyboard and mouse to the monitor USB ports.
Installing the 9025TR Platform
(Optional) Connecting to Facility Compressed Air
Complete the following steps to connect the ECUTS to the facility compressed air.
Equipment
- 6 mm outer diameter air hose
- Connect a 6 mm outer diameter air hose to the pneumatic air port.
- Turn on the facility compressed air connected to the ECUTS.
Related Information
- Configuring Pneumatics
The ECUTS does not ship ready for use with facility compressed air. To configure the ECUTS pneumatics to route compressed air, use the following guidelines: