Behavior in Case of Shutdown
- Updated2023-12-28
- 1 minute(s) read
Behavior in Case of Shutdown
Measurements are paused if the powertrain application shuts down. If a test is unloaded, the current pause state of the measurements is stored. If this test is reloaded, then the previous pause state of the measurements is restored.
If the test bench is controlled remotely (optional), the measurements start automatically without version change. You can configure this behavior individually. Otherwise, the software prompts you to choose if and how to continue the measurement.