Complete the following steps before beginning this repair procedure:
  1. Power off your ATE Core Configurations Generation 2 system by flipping the main disconnect branch breaker to off.
  2. If your ATE Core Configurations Generation 2 system utilizes a UPS to provide backup power, press the power button on the UPS to power it down.
  3. Disconnect your ATE Core Configurations Generation 2 system from facility power.
Refer to the following table to see which shipping kits this procedure applies to.
Shipping Kit Part Number Description
789507-01 ESD Casters
789508-01 Standard Casters

Equipment

  • 5 mm hex key, 2.82 N · m (25.0 in. · lb)
  1. Use a forklift to lift your ATE Core Configurations Generation 2 system above ground level to access the casters at the bottom of your ATE Core Configurations Generation 2 system.
  2. Remove the four casters on your ATE Core Configurations Generation 2 system by unscrewing the four screws securing each caster to the bottom of your ATE Core Configurations Generation 2 system using the 5 mm hex key.
  3. Install the new casters on the bottom of your ATE Core Configurations Generation 2 system by screwing in the four screws for each caster using the 5 mm hex key.
    1. ATE Core Configurations Generation 2 system casters
  4. Lower your ATE Core Configurations Generation 2 system back to ground level.
Once installation of the new casters is complete, you can reconnect facility power to your ATE Core Configurations Generation 2 system and power on the rack.