Connecting Current Transducers with Current Output
- Updated2025-11-24
- 1 minute(s) read
- Current transducer
- SHDB9M-DB9F cable
Complete the following steps.
-
Power off BTS-16110 and the system you are connecting to
BTS-16110.
Caution You must de-energize the system before you connect it to BTS-16110 for measurement. Follow all workplace safety requirements for powering down hazardous voltage systems based on the applicable codes and standards in your location.
- Connect the female D-sub connector on the SHDB9M-DB9F cable to the D-sub port on the transducer and tighten the retention screws.
-
Connect the male D-sub connector on the SHDB9M-DB9F
cable to the current transducer input port on the BTS-16110
and tighten the retention screws.
Figure 13. Connecting a Current Transducer for Current Output
- Power on BTS-16110 and the system you are connecting to BTS-16110.