Use the scheduling assistant to schedule a test plan based on which systems and DUTs are available.

Introduced in October 2024

Before you schedule a test plan, create the test plan.
  1. Find the test plan you want to schedule.
    OptionDescription
    See all test plans.
    1. Navigate to Operations » Test Plans.
    2. You can filter the list of existing test plans by clicking the summary tiles at the top of the page.
    See test plans for a specific work order.
    1. Navigate to Operations » Work Orders.
    2. Click the work order for which you want to schedule a test plan.
    3. Click Test Plans.
    See test plans for a specific product.
    1. Navigate to Product Insights » Products.
    2. Click the product for which you want to schedule a test plan.
    3. Click Test Plans.
  2. Select a test plan.
  3. Click Schedule.
  4. From the left hand panel, select the system where you want to run the test plan.
    SystemLink adds shading to the top row to indicate when other tests are scheduled for the selected system.
  5. Scroll to the bottom and select the DUT.
  6. In the top row, click and drag the test plan to the desired time slot.
  7. Click Save.
To view tests scheduled across all systems, navigate to Operations » Schedule.