This document contains the Battery Test System Software Toolkit known issues that were discovered before and since the release of Battery Test System Software Toolkit 2022 Q2. Known issues are performance issues or technical bugs that NI has acknowledged exist within this version of the product.

 

Not every issue known to NI appears on this list; it is intended to show the most severe and common issues that you may encounter and provide workarounds when possible. Other technical issues that you may encounter could occur through normal product use or system compatibility issues. You may find more information on these issues in NI’s Product Documentation, Knowledgebase, or Community.

Bug Number

Legacy ID

Description

Details

1596248

Test Monitor does not attach large test reports to SystemLink

TestStand report files over 80 MB are not uploaded to SystemLink and attached to the corresponding test result.

Workaround:

Ensure your report files are smaller than 80 MB or transfer them manually.

Complete the following steps to ensure the report is unique to each DUT if you are using the batch process model:
  1. Navigate to Configure > Results Processing...
  2. Select the Options... icon in the Report row.
  3. Select the Report File Pathname tab.
  4. Configure the report to be created per DUT.

Reported Version:

Battery Test System Software Toolkit 2.0

Resolved Version:

N/A

Added:

N/A

1873086

Battery test package files cannot be removed once submitted through the BatteryTestPackageLoader

Once battery tests package files are submitted through the BatteryTestPackageLoader, they cannot be removed from the database of the server.

Workaround:

Submitting a package file with the same name updates the existing configuration. In this case, the old version is archived and used only by existing test plans. Submitting a configuration with a different name results in a new test plan.

Reported Version:

Battery Test System Software Toolkit 2022 Q2

Resolved Version:

N/A

Added:

N/A

1955596

Cannot resume a test execution from the Web UI

Tests cannot be resumed from the Web UI if the Lab PC is rebooted or if the BTS Test Executor software is closed or restarted.

Workaround:

Launch the test sequence from the deployed package file and run it to completion.

Reported Version:

Battery Test System Software Toolkit 2022 Q2

Resolved Version:

N/A

Added:

N/A

1985043

The NI Battery Test System Web Server does not start properly in slow computers

The NI Battery Test System Web Server windows service does not start properly and displays a timeout error in slow computers.

Workaround:

Increase the Windows service timeout value following the instructions here: A slow service does not start due to time-out error in Windows

Reported Version:

Battery Test System Software Toolkit 2022 Q2

Resolved Version:

N/A

Added:

N/A

1987619

Test fails if the previous test execution is aborted

If a test is stopped from the Web UI using the Stop button, the next test to run immediately fails after deploying the VeriStand project. Subsequent tests, however, will run correctly.

Workaround:

Re-run the test that failed.

Reported Version:

Battery Test System Software Toolkit 2022 Q2

Resolved Version:

N/A

Added:

N/A

2023751

Cannot run a test because the test station is reserved

A Lab PC may remain reserved after failing to run a test that has missing dependencies, such as Real-Time sequences, sequence files, and other software components. The Web UI displays "An unexpected error occurred," and the server's log contains an entry that reads "Unhandled exception in circuit. System.InvalidOperationException: The value alreadyRunningTestPlan should not be Null." No further tests can be run in the Lab PC after this event.

Workaround:

  1. Get the failing test station ID by navigating to C:\ProgramData\National Instruments\Battery Test System\.teststationid in the Lab PC that remains reserved.
  2. Remove the reservation from the server by navigating to C:\ProgramData\National Instruments\Battery Test System\FileStorage\.TestPlanRunReservations in the server PC and removing the JSON entry for the problematic test station ID.
  3. Restart the Battery Test System Web Server service from the Windows Task Manager.

Reported Version:

Battery Test System Software Toolkit 2022 Q2

Resolved Version:

N/A

Added:

N/A

Final Time Issue Listed

Issues found in this section will not be listed in future known issues documents for this product.

There are currently no issues to list.

Additional Resources

Explore Support Content and Product Documentation 

 

 

Ask the NI Community

 

 

Request Support from an Engineer

 

A valid service agreement may be required, and support options vary by country

 

Glossary of Terms

 

  • Bug ID - When an issue is reported to NI, you may be given this ID or find it on ni.com.  You may also find IDs posted by NI on the discussion forums or in KnowledgeBase articles.
  • Legacy ID – An older issue ID that refers to the same issue.  You may instead find this issue ID in older known issues documents.
  • Description - A few sentences which describe the problem. The brief description given does not necessarily describe the problem in full detail.
  • Workaround - Possible ways to work around the problem.
  • Reported Version - The earliest version in which the issue was reported.