Part Average Testing Entry Points (TSM)
- 已更新2025-07-31
- 閱讀時間為 1 分鐘
At specific points during test program execution, TSM calls the following set of required part average testing (PAT) entry point sequences in the <TestStand Public>\Components\Callbacks\NI_SemiconductorModule\PartAverageTestingCallbacks.seq file. TSM calls the entry point sequences for each site independently.
- Setup—Initializes the PAT algorithm for the site.
- Customize—Customizes all the PAT tests for the site.
- Perform—Performs part average testing for the site by setting limits and evaluating PAT tests.
- Cleanup—Performs finalization tasks.