Considerations for ETS Targets (Control Design and Simulation Module)
- Updated2023-03-14
- 1 minute(s) read
If you are executing a simulation on an NI ETS target, NI recommends you let the LabVIEW Control Design and Simulation Module calculate the necessary value of the simulation period. To automatically calculate the period, place a checkmark in the Auto Period checkbox, which is located on the Timing Parameters page of the Configure Simulation Parameters dialog box.
When you follow this procedure, other tasks can to continue to execute when the simulation is not scheduled to execute.