Saves a copy of the LabVIEW project that is readable by LabVIEW 8.0 and later. This method is similar to the LabVIEW Version selection in the Save for Previous Version dialog box.

Note The LabVIEW Datalogging and Supervisory Control Module supports this method in the Run-Time Engine.

Parameters

Name Data type Required Description
Path cpath.png Yes

Path to the directory where you want to save the LabVIEW project.

Version cstr.png No

Version of LabVIEW for which you want to save. Wire the version number, such as 8.6 or 9.0, to the Version input. The default is the immediately previous version.

Remarks

The following table lists the characteristics of this method.

Short Name Save For Previous
Data type No return value
Available in Run-Time Engine No
Available in Real-Time Operating System No
Settable when the VI is running No
Loads the front panel into memory No
Need to authenticate before use No
Loads the block diagram into memory No
Remote access allowed Yes