Battery Test System Workflow
- Updated2024-10-31
- 2 minute(s) read
The following image illustrates the battery test system workflow. It includes example roles as well, such as design engineers, test engineers, and integrators:
The design engineers specify the devices that need to be tested (the DUTs) as well as the tests to be run on them. Integrators and test engineers then take these requirements, and using the Web UI, create a custom UI that captures the various elements of test environment such as the DUTs, test stations, and the I/O signals to monitor. The lab manager then uses the custom UI to create the actual test plans. A test plan is a combination of one or more DUTs, a test, and a test station. The Operator then executes the test plans and the design engineer evaluates the results.
Additional terms are defined as follows:
Related Information
- Architecture of Test Plans in the Battery Test System Web UI
The Battery Test System Web UI is based around an overall battery test architecture. You can access specific functionality and control test execution in real-time by configuring and executing Test Plans in the Web UI.