Configuring for Uploading DUT Reports and Result Data to SystemLink

To upload individual DUT reports and test result data to SystemLink, configure in TestStand Sequence Editor before running sequences.

  1. Select Configure » Result Processing to launch the Result Processing dialog box.
  2. Select the Enabled checkbox for NI SystemLink Test Monitor Client.
  3. Click the Options (1378) button to launch the Options dialog box and select the information you want to add to test reports, as the following figure shows. You can keep or edit the default settings according to test requirements.

    1378