The following items are notable issues fixed between the release of Battery Test System Software 2022 Q2 and Battery Test System Software 2022 Q4, including additional patches and service packs. If you have an issue ID, you can search this list to validate that the issue has been fixed. This is not an exhaustive list of issues fixed in the current version of Battery Test System Software.
Bug Number |
Legacy ID |
Description |
Details |
---|---|---|---|
1955596 |
Cannot resume a test execution from the Web UITests cannot be resumed from the Web UI if the Lab PC is rebooted or if the BTS Test Executor software is closed or restarted.
Workaround: Fixed in the Battery Test System Software 2022 Q4. If using an older version, launch the test sequence from the deployed package file and run it to completion by following these instructions:
Note: Ensure no other test is queued to run in the test station during the execution of the above steps.
|
Reported Version: Battery Test System Software 2022 Q2 Resolved Version: Battery Test System Software 2022 Q4 Added: Oct 24, 2022 |
|
2048188 |
Resumed tests in the test station fail to attach all reports to SystemLinkA test that stopped running and is later resumed may leave temporary report files not attached to SystemLink.
Workaround: Fixed in the Battery Test System Software 2022 Q4.
|
Reported Version: Battery Test System Software 2022 Q2 Resolved Version: Battery Test System Software 2022 Q4 Added: Oct 24, 2022 |
|
2056761 |
Web UI is unresponsive after a test station connection errorThe Web UI becomes unresponsive after it loses connection with a test station and displays the error message: "Cannot connect
to test station. Please refresh the page to reconnect."
Workaround: Fixed in the Battery Test System Software 2022 Q4.
|
Reported Version: Battery Test System Software 2022 Q2 Resolved Version: Battery Test System Software 2022 Q4 Added: Oct 24, 2022 |
|
2123445 |
The icon to view a test result in SystemLink shows disabledThe Web UI may show disabled the icon to view the SystemLink test result some time after a test completes.
Workaround: Fixed in the Battery Test System Software 2022 Q4.
|
Reported Version: Battery Test System Software 2022 Q2 Resolved Version: Battery Test System Software 2022 Q4 Added: Oct 24, 2022 |
|
2123694 |
A DUT shows as Passed after it is stopped and the other DUTs in the execution completed normallyA DUT shows with a Passed status in the test results page after it is stopped and the other DUTs (sockets) in the execution completed normally.
Workaround: Fixed in the Battery Test System Software 2022 Q4.
|
Reported Version: Battery Test System Software 2022 Q2 Resolved Version: Battery Test System Software 2022 Q4 Added: Oct 24, 2022 |
|
2150528 |
The File Mover and SystemLink custom devices cannot be used in same system definition fileAdding the File Mover and SystemLink custom devices to the same VeriStand system definition file will result in errors loading dependencies.
Workaround: Fixed in the Battery Test System Software 2022 Q4.
|
Reported Version: Battery Test System Software 2022 Q2 Resolved Version: Battery Test System Software 2022 Q4 Added: Oct 24, 2022 |
|
2150854 |
NI-XNET database files in the .teststation file are incorrectly registered to the Lab PCNI-XNET database files declared in the .teststation file and stored next to it are incorrectly registered to the Lab PC because their generated paths are wrong in the nixnetAlias.xml file of the test package.
Workaround: Fixed in the Battery Test System Software 2022 Q4.
|
Reported Version: Battery Test System Software 2022 Q2 Resolved Version: Battery Test System Software 2022 Q4 Added: Oct 24, 2022 |
Installing some patches may require certain additional steps or considerations. Please refer to the following table for more information about patches for this release.
These patches currently do not have any special instructions.