After you complete the compensation procedures for the VCSEL I-V Test
Subsystem, configure the connections between the subsystem
and your load board to prepare to perform I-V measurements on packaged DUTs.
Before you begin this procedure, you must run system
compensation and pulse compensation to characterize the performance of cables and
components used in the
VCSEL I-V Test
Subsystem. Additionally, verify the impedance
configuration for each
NI-4134 in the subsystem before connecting cables to the
NI-4134.
Equipment
The following
equipment is required to set up one subsystem channel.
- BNC (m)-to-BNC (m) cables (x2 for full impedance NI-4134 configuration, x3 for half impedance NI-4134 configuration)
- PRIMARY cable
- SECONDARY cable (half impedance NI-4134 configuration only)
- SCOPE cable
- 30 dB attenuator (x1)

Notice
You must run the system compensation procedure using the PRIMARY,
SECONDARY, and SCOPE cables before you connect the VCSEL I-V Test
Subsystem to a load board.
Complete the
following steps to connect a NI-4134 and PXIe-5162 to a load board.
-
Connect the PRIMARY cable to the HIGH SPEED PULSE PRIMARY output on the NI-4134 back panel.
-
Connect the opposite end of the PRIMARY cable to the primary receptacle on the
load board.
-
If you are using the half impedance NI-4134 configuration, connect the SECONDARY
cable to the HIGH SPEED PULSE SECONDARY output on the NI-4134 back panel.
-
Connect the opposite end of the SECONDARY cable to the secondary receptacle on
the load board.
-
Attach the 30 dB attenuator to the first available analog input channel on the PXIe-5162 front panel.
-
Connect the SCOPE cable to the attenuator attached to the PXIe-5162.
-
Connect the opposite end of the SCOPE cable to the remote sense terminal on the
load board.
If your
VCSEL I-V Test
Subsystem contains multiple
NI-4134 pulse generators, repeat this procedure for each
NI-4134 in the subsystem.