Table Of Contents

Pulsed Operation

Version:
    Last Modified: November 30, 2020

    Dynamic load, minimum pulse cycle time[1]

    25 μs/W

    The following figure visually explains the terms used in the extended range pulsing sections.

    Figure 1. Definition of Pulsing Terminology
    • 1 For example, given a continuous pulsin load, if the largest dynamic step in power that the load sources/sinks is from 5 W to 15 W, then the maximum SMU power step is 10 W. Thus, the minimum dynamic load pulse cycle time is 250 μs.

    Recently Viewed Topics