Table Of Contents

Setting the Graph History Length

Last Modified: August 20, 2020

Set the amount of data you can pause and view in graphs by specifying the history length.

Use these methods to set the history length for graphs that support hold and pan viewing control.

Set the Default History Length

Go to File»Preferences and specify the history length for your graph type on the Project Defaults tab.

These settings will determine the history length for your graphs in each newly created project.

Set Project-Level History Length

In an open project, go Project»Settings and specify the history length for your graph type.

This will override the default graph history length for this project.


Recently Viewed Topics