Skipping Pre-Lot Testing or Running Only Pre-Lot Testing
- Updated2025-04-10
- 1 minute(s) read
Skipping Pre-Lot Testing or Running Only Pre-Lot Testing
Define if and how TSM proceeds with lot testing after pre-lot testing.
Introduced in TSM 2024 Q3.1
If the PreLotTesting sequence exists in the test program sequence file, TSM runs pre-lot testing. You can also run only pre-lot testing or skip pre-lot testing. To configure if and how TSM runs pre-lot testing, complete the following steps.- On the TSM toolbar, navigate to .
- In the Specify New Condition Name window, select Standard Condition.
- From the Standard Condition drop-down menu, select PreLotTestingMode.
-
Specify the Test Condition Value. Enter the option that
aligns with your goal.
Option Description EndLotAfterComplete TSM ends the lot after running the pre-lot testing. Reports include only test results from pre-lot testing. Skip TSM does not run the pre-lot testing. ContinueTestingAfterComplete TSM continues with lot testing after running the pre-lot testing. This is the default behavior. If you leave the Test Condition Value empty, TSM behaves as though you entered ContinueTestingAfterComplete.