Loading the Main Test or the Control Test at a Test Station

After configuring the test station, send the main test or the control test to the test station. Load the test at that test station.

Loading a control test is only required if you test more than one pack or module at the test station.

Complete the following steps to load the main test or the control test at the test station.

  1. In the PAconfigurator Development area, navigate to ###STANDARD### » Accessories_tests.
  2. Select the folder for the desired test.
    OptionDescription
    Main test Select BattCell_MainTest.
    Control test Select Control_Test.
  3. Select the desired test.
  4. Click Send to Test Station.
    A Test Station Configuration window appears.
  5. In the Test Station Configuration window, select a test station runtime slot for the main test or the control test.
  6. Click Send.
    PAconfigurator sends the test to the PXI.
  7. Launch PAcontroller.
  8. In the Test Station browser, select the test station Data Source and associated RTS Slot Name.
    To change the active test station, click Test Station.
  9. In the upper left area, click the Load Test button.
  10. Select the main test or the control test you want to load and click OK.
The main test or the control test loads and begins executing.