Setting the Graph History Length
- Updated2025-11-19
- 1 minute(s) read
Set the amount of data you can pause and view in graphs by specifying the history length.
Use these methods to set the history length for graphs that support hold and pan viewing control.
| Set the Default History Length |
Determines the history length for your graphs in all new projects. Go to and specify the history length for your graph type on the Project Defaults tab. |
| Set Project-Level History Length |
Overrides the default graph history length for this project. In an open project, go and specify the history length for your graph type. |