Complete the following steps before beginning this repair procedure:
  1. Power off your ATE Core Configurations Generation 2 system by flipping the main disconnect branch breaker to off.
  2. If your ATE Core Configurations Generation 2 system utilizes a UPS to provide backup power, press the power button on the UPS to power it down.
  3. Disconnect your ATE Core Configurations Generation 2 system from facility power.
Refer to the following table to see which shipping kits this procedure applies to.
Shipping Kit Part Number Description
789092-01 Dual C13 AC Power Cable

The diagram in this procedure illustrates the ATE-38U/44U front I/O panel. If you are replacing cables on the rear I/O panel or on the ATE-15U, the same procedure applies.

Equipment

  • 3 mm hex key
  1. Remove the ATE Core Configurations Generation 2 left side panel using the 3 mm hex key.
  2. Locate the dual C13 AC power cable that you are replacing and unplug it from the RMX-10151 Power Distribution Unit (PDU) it is connected to.
  3. Unlatch the dual C13 AC power cable from the I/O panel and remove it from the rack.
  4. Install the new dual C13 AC power cable in the I/O panel and reconnect the other end of the cable to the RMX-10151 PDU.
    1. Dual C13 power cable
  5. Reinstall the ATE Core Configurations Generation 2 left side panel using the 3 mm hex key.

Once installation of the new dual C13 AC power cable is complete, you can reconnect facility power to your ATE Core Configurations Generation 2 system and power on the rack.