Replacing a Dual C13 AC Power Cable
- Updated2025-07-11
- 2 minute(s) read
- Power off your ATE Core Configurations Generation 2 system by flipping the main disconnect branch breaker to off.
- If your ATE Core Configurations Generation 2 system utilizes a UPS to provide backup power, press the power button on the UPS to power it down.
- Disconnect your ATE Core Configurations Generation 2 system from facility power.
Shipping Kit Part Number | Description |
---|---|
789092-01 | Dual C13 AC Power Cable |
The diagram in this procedure illustrates the ATE-38U/44U front I/O panel. If you are replacing cables on the rear I/O panel or on the ATE-15U, the same procedure applies.
Equipment
- 3 mm hex key
- Remove the ATE Core Configurations Generation 2 left side panel using the 3 mm hex key.
- Locate the dual C13 AC power cable that you are replacing and unplug it from the RMX-10151 Power Distribution Unit (PDU) it is connected to.
- Unlatch the dual C13 AC power cable from the I/O panel and remove it from the rack.
-
Install the new dual C13 AC power cable in the I/O panel and reconnect the other end of
the cable to the RMX-10151 PDU.
- Dual C13 power cable
- Reinstall the ATE Core Configurations Generation 2 left side panel using the 3 mm hex key.
Once installation of the new dual C13 AC power cable is complete, you can reconnect facility power to your ATE Core Configurations Generation 2 system and power on the rack.