Table Of Contents

Configuring and Saving a Project

Last Modified: May 29, 2018

You can use FlexLogger projects to store a specific hardware configuration, logging properties, and additional project information for your system, and then save the configuration for reuse.

  1. Configure your measurement for use in the project by adding signals to the Channel specification. For information on how to configure signals, refer to the Configuring Your Measurements topic.
  2. Set up the logging requirements for your project by configuring the Logging Specification. For information on how to configure the logging properties, such as file names and triggering behavior, refer to the Logging Data topic.
  3. Record any project-level information, such as lab instructions, in the Description field of the Logging Specification document.
  4. If you wish to create a dashboard to visualize the live data being acquired, add configured channels to your Screens document. For information on how to add indictors and signals to your Screen document, refer to the Visualizing Live Data topic.
  5. To save this project configuration for future use, select File»Save All. Choose a Project name and file Location, if desired.
spd-note-note
Note  

Only one FlexLogger project can be in use for acquisition and logging at any time. You cannot use multiple FlexLogger projects simultaneously.


Recently Viewed Topics