Table Of Contents

Verifying User Programs

Version:
    Last Modified: September 6, 2017

    Complete the following steps to change the mode to Operational Mode.

    spd-note-note
    Note  

    Verify that the User Program responds as expected for all configured faults.

    spd-note-note
    Note  

    Verify the safety response time for all configured faults.

    1. Open the LabVIEW Project (.lvproj) created to monitor the safety system.
    2. Right-click the module in the LabVIEW Project and select Properties.
    3. Click the Change Mode to button.
    4. Type verify and click OK.
    5. Verify the module mode has updated to Operational Mode in the Mode field.

    Recently Viewed Topics